What type of waste does
your facility generate?

This field is for validation purposes and should be left unchanged.

This field is for validation purposes and should be left unchanged.

Please answer the following questions and we'll build your EDS system.

Processing temperature requirements(Required)
Processing time requirements(Required)
Containment level(Required)
What level of redundancy is required?(Required)
Will the space be climate controlled?

What utilities are available?

This field is for validation purposes and should be left unchanged.

Total savings per pound

$X.XX

Total savings per year

$X.XX

Get the full
savings report

This field is for validation purposes and should be left unchanged.

Total savings per pound

$X.XX

Total savings per year

$X.XX

Get the full
savings report

This field is for validation purposes and should be left unchanged.